| Project No(s). |
Title |
Expenditures |
| MPBIH08001 |
PREPARATION OF A HCFC PHASE-OUT MANAGEMENT PLAN |
$ 115,590 |
| MP/BIH/07/001 |
NATIONAL ODS PHASE-OUT PLAN (THIRD TRANCHE) |
$ 16,506 |
| MP/BIH/04/123 |
NATIONAL ODS PHASE-OUT PLAN: SECOND TRANCHE |
$ 228,996 |
| MP/BIH/04/065 |
EXTENSION OF INSTITUTIONAL STRENGTHENING: PHASE II |
$ 61 |
| MP/BIH/04/019 |
PHASE-OUT OF HALON CONSUMPTION |
$ 58,067 |
| MP/BIH/03/091 |
NATIONAL ODS PHASE-OUT PLAN (FIRST TRANCHE) |
$ 263,302 |
| MP/BIH/03/090 |
PHASE-OUT OF METHYL BROMIDE IN TOBACCO SEEDLING VEGETABLES AND FLOWER PRODUCTION SECTOR |
$ 225,663 |
| MP/BIH/03/030 |
PHASE-OUT OF CFC-11 BY CONVERSION TO N-PETANE IN THE MANUFACTURE OF RIGID FOAM PRODUCTS FOR INSULATING PURPOSES AT STIROKART CO. |
$ 364,635 |
| MP/BIH/03/029 |
REPLACEMENT OF CFC-12 WITH HFC-134A, CFC-11 WITH HCFC-141B, AND TCA WITH NON-CLEANING PROCESS IN THE MANUFACTURE OF COMMERCIAL REFRIGERATION EQUIPMENT, PANELS, AND HEAT CHANGERS AT THREE ENTERPRISES (SOKO PANELI, SOKO IPV AND KUCA LEDA) |
$ 169,414 |
| MP/BIH/02/063 |
PREPARATION OF AN INVESTMENT PROJECT IN THE RIGID FOAM SECTOR |
$ 14,584 |
| MP/BIH/02/049 |
PREPARATION OF TWO INVESTMENT PROJECTS IN THE COMMERCIAL REFRIGERATION SECTOR |
$ 11,537 |
| MP/BIH/02/016 |
PREPARATION OF A NATIONAL ODS PHASE-OUT PLAN |
$ 78,078 |
| MP/BIH/01/227 |
CONVERSION FROM CFC-11 TO METHYLENE CHLORIDE IN THE PRODUCTION OF FLEXIBLE SLABSTOCK FOAM AT INGA CO. |
$ 100,445 |
| MP/BIH/01/219 |
REPLACEMENT OF REFRIGERANTS CFC-12 AND R-502 WITH HFC-134A AND R-404A, AND FOAM BLOWING AGENT CFC-11 WITH HCFC-141B IN THE MANUFACTURE OF COMMERCIAL REFRIGERATION EQUIPMENT AND COLD REFRIGERATION CHAMBERS AT SOKO |
$ 158,889 |
| MP/BIH/01/218 |
REPLACEMENT OF REFRIGERANT CFC-12 WITH HFC-134A AND FOAM BLOWING AGENT CFC-11 WITH CYCLOPENTANE IN THE MANUFACTURE OF COMMERCIAL REFRIGERATION EQUIPMENT AT BIRA, BIHAC |
$ 536,161 |
| MP/BIH/01/163 |
PREPARATION OF TWO INVESTMENT PROJECTS IN THE FLEXIBLE FOAM SECTOR |
$ 14,263 |
| MP/BIH/01/072 |
PROJECT PREPARATION IN THE COMMERCIAL REFRIGERATION SECTOR |
$ 13,388 |
| MP/BIH/01/071 |
PROJECT PREPARATION IN THE COMMERCIAL/DOMESTIC REFRIGERATION SECTOR |
$ 6,976 |
| MP/BIH/00/035 |
PROJECT PREPARATION IN THE FLEXIBLE FOAM SECTOR |
$ 14,763 |
| MP/BIH/99/053 |
ESTABLISHMENT OF AN OZONE SECRETARIAT |
$ 104,709 |
| MP/BIH/97/061 |
COUNTRY PROGRAMME PREPARATION |
$ 80,000 |
| DP/BIH/97/046 |
REGIONAL BUSINESS DEVELOPMENT CENTRES |
$ 655,425 |
| DP/BIH/97/044, NT/BIH/97/044 |
ESTABLISHMENT OF A HOSPITAL BIO-MEDICAL ENGINEERING CENTRE FOR REPAIR AND MAINTENANCE OF MEDICAL EQUIPMENT |
$ 28,500 |
| DP/BIH/97/044, NT/BIH/97/044 |
ESTABLISHMENT OF A HOSPITAL BIO-MEDICAL ENGINEERING CENTRE FOR REPAIR AND MAINTENANCE OF MEDICAL EQUIPMENT |
$ 597,142 |
| XP/BIH/96/055 |
PREPARATORY ASSISTANCE IN ESTABLISHING A MEDICAL EQUIPMENT REPAIR AND MAINTENANCE CENTRE |
$ 10,000 |
| UC/BIH/96/051 |
PREPARATORY ASSISTANCE FOR THE DEVELOPMENT OF A NATIONAL STRATEGY FOR INDUSTRIAL RESTRUCTURING AND DEVELOPMENT, WITH PARTICULAR EMPHASIS ON THE PROMOTION OF SMES |
$ 38,178 |
| DP/BIH/96/027 |
PROVISION OF TECHNICAL ASSISTANCE TO BOSNALIJEK PHARMACEUTICAL AND CHEMICAL LTD., SARAJEVO |
$ 1,662,406 |
| DP/BIH/96/005 |
PREPARATORY ASSISTANCE FOR THE DEVELOPMENT OF A NATIONAL STRATEGY FOR INDUSTRIAL RESTRUCTURING AND DEVELOPMENT, WITH EMPHASIS ON THE PROBLEM OF SMES |
$ 47,302 |
| SI/BIH/95/801 |
ASSISTANCE TO BOSNIA-HERZEGOVINA IN THE APPRAISAL OF INVESTMENT PROJECTS RELATED TO ECONOMIC AND INFRASTRUCTURAL RECONSTRUCTION |
$ 38,043 |
| TF/BIH/95/0A1 |
EMERGENCY ASSISTANCE TO THE "KLAS" COMPLEX FOR CEREAL PROCESSING IN SARAJEVO AND TO THE CEREAL PROCESSING INDUSTRY OF BOSNIA HERZEGOVINA |
$ 200,000 |
| TF/BIH/95/001 |
EMERGENCY ASSISTANCE TO THE "KLAS" COMPLEX FOR CEREAL PROCESSING IN SARAJEVO AND TO THE CEREAL PROCESSING INDUSTRY OF BOSNIA HERZEGOVINA |
$ 163,194 |
| SI/BIH/94/801 |
ASSISTANCE TO KLAS-SARKO BISCUIT FACTORY IN THE PRODUCTION OF HIGH PROTEIN BISCUITS FOR SARAJEVO |
$ 18,052 |
| XP/BIH/94/095 |
DATA COLLECTION AND PROCESSING FOR FINALIZATION OF PROJECT DOCUMENT ON UNIDO POST-EMERGENCY INDUSTRIAL RECONSTRUCTION PROGRAMME - SEGMENT OF PHARMACEUTICALS AND HOSPITAL CONSUMABLES AND EQUIPMENT |
$ 3,750 |
| DP/BIH/94/001 |
ASSESSMENT OF RESTRUCTURING NEEDS OF INDUSTRIAL ENTERPRISES IN BOSNIA AND HERZEGOVINA |
$ 147,427 |
| NT/BIH/94/001 |
ASSISTANCE FOR THE TRANSITION TO MARKET ECONOMY |
$ 10,450 |
|
| Total: 35 |
$ 6,195,885 |