| Project No(s). |
Title |
Expenditures |
| XP/SYR/10/003,XX/SYR/10/X01 |
FORMULATION OF THE AL-GHAB DEVELOPMENT PROGRAMME (AGRO-INDUSTRIES PILLAR) |
$ 18,542 |
| MP/SYR/09/003 |
PREPARATION FOR HCFC PHASE-OUT INVESTMENT ACTIVITIES (REFRIGERATION MANUFACTURING SECTOR) |
$ 31,677 |
| MP/SYR/09/002 |
NATIONAL CFC PHASE-OUT PLAN FOR SYRIA (THIRD TRANCHE) |
$ 403 |
| MPSYR08002 |
NATIONAL CFC PHASE-OUT PLAN |
$ 73,096 |
| MPSYR08001 |
PREPARATION OF A HCFC PHASE-OUT MANAGEMENT PLAN |
$ 52,493 |
| XPSYR07001 |
INDEPENDENT EVALUATION OF THE INTEGRATED PROGRAMME IN SYRIA |
$ 29,494 |
| MP/SYR/06/002 |
NATIONAL CFC PHASE-OUT PLAN FOR SYRIA (FIRST TRANCHE) |
$ 347,553 |
| MP/SYR/06/001 |
METHYL BROMIDE NATIONAL PHASE-OUT PLAN (SOIL FUMIGATION) |
$ 173,966 |
| TE/SYR/05/B03 |
INDUSTRIAL MODERNIZATION AND UPGRADING PROGRAMME - TEXTILES |
$ 284,331 |
| TE/SYR/05/A03 |
INDUSTRIAL MODERNIZATION AND UPGRADING PROGRAMME |
$ 75,871 |
| DP/SYR/05/006 |
SUPPORT TO THE IMPLEMENTATION OF THE UNIDO INTEGRATED PROGRAMME "MADE IN SYRIA" INDUSTRIAL DEVELOPMENT STRATEGY - COMPONENT 1, COMPLEMENTARY PHASE |
$ 35,680 |
| MP/SYR/05/005 |
DEMONSTRATION PROJECT ON THE REPLACEMENT OF CFC CENTRIFUGAL CHILLERS |
$ 559,343 |
| MP/SYR/05/004 |
PHASE-OUT METHYL BROMIDE IN GRAIN FUMIGATION (THIRD TRANCHE) |
$ 254,993 |
| TE/SYR/05/003,TF/SYR/05/003 |
INDUSTRIAL MODERNIZATION AND UPGRADING PROGRAMME |
$ 1,558,841 |
| MP/SYR/05/002 |
EXTENSION OF INSTITUTIONAL STRENGTHENING: PHASE III |
$ 203,805 |
| MP/SYR/05/001 |
PREPARATION OF CFC-PHASE-OUT PLAN INCLUDING METHYL BROMIDE |
$ 68,101 |
| MP/SYR/03/107 |
PHASE-OUT OF METHYL BROMIDE IN GRAIN STORAGE (SECOND TRANCHE) |
$ 349,966 |
| XP/SYR/03/018 |
SEED MONEY FOR IP SYRIA |
$ 68,000 |
| US/SYR/03/009, US/SYR/04/009 |
TECHNO-ECONOMIC STUDY ON THE ESTABLISHMENT OF A FULLY VERTICAL TEXTILE AND GARMENT FACTORY IN TARTOUS |
$ 2,030 |
| XP/SYR/03/003 |
SEED MONEY FOR IP SYRIA |
$ 80,998 |
| MP/SYR/02/159 |
PLAN FOR ELIMINATION OF CFCS IN THE REFRIGERATION MANUFACTURING SECTOR (DOMESTIC REFRIGERATION) |
$ 352,574 |
| MP/SYR/02/158 |
PHASING OUT OF CFC-12 BY CONVERSION TO N-BUTANE AS A BLOWING AGENT IN THE MANUFACTURING OF EXTRUDED POLYSTYRENE (EPS) FOAM FOR PACKING PURPOSES AT SHANKO AND PARTNERS CO. |
$ 132,201 |
| MP/SYR/02/024 |
PREPARATION OF A NATIONAL ODS PHASE-OUT PLAN |
$ 3,156 |
| MP/SYR/02/023 |
PREPARATION OF AN INVESTMENT PROJECT IN THE EXTRUDED POLYSTYRENE FOAM SECTOR |
$ 14,920 |
| DP/SYR/02/006 |
PREPARATORY ASSISTANCE TO SUPPORT GOVERNMENT REFORMS OF PUBLIC INDUSTRIES (UNIDO PROGRAMME SUPPORT) |
$ 413,246 |
| MPSYR01182 |
PHASING OUT THE USE OF METHYL BROMIDE IN GRAIN STORAGE (FIRST TRANCHE) |
$ 300,000 |
| MP/SYR/01/135 |
CONVERSION FROM CFC-11 TO METHYLENE CHLORIDE IN THE PRODUCTION OF FLEXIBLE SLABSTOCK FOAM AT AL-MUZAYEK |
$ 106,790 |
| MP/SYR/01/078 |
RENEWAL OF INSTITUTIONAL STRENGTHENING: PHASE II |
$ 191,883 |
| XP/SYR/01/018 |
PROGRAMMING MISSION TO SYRIA |
$ 7,260 |
| MP/SYR/01/014 |
PHASING OUT CFC-11 AND 12 IN THE MANUFACTURE OF HAIR LACQUERS BY CONVERSION TO HYDROCARBON PROPELLANT AT BADRAN & CO. |
$ 68,640 |
| MP/SYR/01/013 |
PHASING OUT CFC-12 IN THE MANUFACTURE OF HAIR LACQUERS BY CONVERSION TO HYDROCARBON PROPELLANT AT MAHMOUD HAMIDA |
$ 46,201 |
| MP/SYR/01/012 |
PHASING OUT CFC-11 AND 12 IN THE MANUFACTURE OF HAIR SPRAYS BY CONVERSION TO HYDROCARBON PROPELLANT AT KHADJI & ZAHKA |
$ 48,370 |
| MP/SYR/01/011 |
PHASING OUT CFC-12 IN THE MANUFACTURE OF INSECTICIDES BY CONVERSION TO HYDROCARBON PROPELLANT AT CHEIKH GHAZAL INSECTICIDE PLANT |
$ 86,528 |
| MP/SYR/01/004 |
CONVERSION FROM CFC-11 TO HCFC-141B IN THE PRODUCTION OF RIGID FOAM PANELS AT BASSAM BAGHDAN |
$ 124,698 |
| TF/SYR/01/001 |
IPU SYRIA |
$ 46,153 |
| MP/SYR/00/108 |
PREPARATION OF A PROJECT IN THE FUMIGANT (METHYL BROMIDE) SECTOR FOR GRAIN FUMIGATION |
$ 14,643 |
| MP/SYR/00/099 |
PREPARATION OF A PROJECT IN THE FLEXIBLE FOAM SECTOR |
$ 19,974 |
| MP/SYR/00/098 |
CONVERSION FROM CFC-11 TO CYCLOPENTANE IN THE PRODUCTION OF RIGID FOAM PANELS AT NATIONAL POLYURETHANE COMPANY (N.P.C.) |
$ 426,104 |
| MP/SYR/99/114 |
CONVERSION FROM CFC-11 TO HCFC-141B AND CFC-12 TO HFC-134A IN THE PRODUCTION OF REFRIGERATORS AND FREEZERS AT ALAMAN CO. |
$ 179,027 |
| MP/SYR/99/113 |
CONVERSION FROM CFC-11 TO HCFC-141B AND CFC-12 TO HFC-134A IN THE PRODUCTION OF REFRIGERATORS AND FREEZERS AT GOLDEN PENGUIN CO. |
$ 195,222 |
| MP/SYR/99/041 |
PROJECT PREPARATION OF INVESTMENT PROJECTS IN THE AEROSOL SECTOR |
$ 6,641 |
| MP/SYR/99/015 |
PROJECT PREPARATION OF INVESTMENT PROJECTS IN THE DOMESTIC REFRIGERATION SECTOR |
$ 17,144 |
| MP/SYR/98/163 |
PREPARATION OF INVESTMENT PROJECT FOR NATIONAL POLYURETHANE COMPANY IN DAMASCUS AND OTHERS IN RIGID FOAM SECTOR |
$ 14,763 |
| MP/SYR/98/095 |
PHASING OUT CFCS AT AL-FAJER COMPANY |
$ 168,926 |
| MP/SYR/98/092 |
PHASING OUT CFC-11 IN MANUFACTURE OF FLEXIBLE PU SLABSTOCK FOAM THROUGH THE USE OF CO2 BLOWING TECHNOLOGY AT NATIONAL POLYURETHANE COMPANY |
$ 543,918 |
| MP/SYR/98/091 |
PHASING OUT CFC-11 IN MANUFACTURE OF FLEXIBLE PU SLABSTOCK FOAM THROUGH THE USE OF METHYLENE CHLORIDE AS BLOWING AGENT AT CHAAR BROS COMPANY |
$ 98,169 |
| MP/SYR/98/055 |
PHASING OUT CFCS AT MARIZA CO. |
$ 204,443 |
| MP/SYR/98/028 |
DEMONSTRATION PROJECT: ALTERNATIVES TO THE USE OF METHYL BROMIDE IN HORTICULTURE AND COMMODITIES FUMIGATION |
$ 476,567 |
| MP/SYR/97/200 |
PREPARATION OF INVESTMENT PROJECT IN THE AEROSOL SECTOR AT NWEYLATI AL FAYER |
$ 14,481 |
| MP/SYR/97/180 |
PHASING OUT OF CFC-11 FROM FLEXIBLE SLABSTOCK FOAM MANUFACTURING AT AKAL FACTORY |
$ 510,131 |
| MP/SYR/97/172 |
PHASING OUT CFCS AT DINA COSMETICS |
$ 228,022 |
| MP/SYR/97/171 |
PHASING OUT CFCS AT LABORATORIES KOSMETO |
$ 173,290 |
| MP/SYR/97/112 |
PHASING OUT CFCS AT TAKI EDDIN AND COMPANY |
$ 244,204 |
| MP/SYR/97/111 |
PHASING OUT CFCS AT AL YAMAN COMPANY |
$ 213,392 |
| MP/SYR/97/110 |
PHASING OUT CFCS AT AHMED ALI HARSHO SONS COMPANY |
$ 171,533 |
| MP/SYR/97/042 |
PROJECT PREPARATION IN THE FLEXIBLE FOAM SECTOR |
$ 9,639 |
| MP/SYR/97/019 |
PHASING OUT CFC-11 AT WALID AND NABIL RANKOUSI LTD. |
$ 84,607 |
| MP/SYR/97/018 |
PHASING OUT CFC-11 AT ABDUL KARIM SBEI |
$ 90,272 |
| MP/SYR/97/016 |
PHASING OUT CFCS AT CAREESSE COSMETICS |
$ 271,413 |
| SI/SYR/96/802 |
HIGH LEVEL TECHNICAL ADVICE TO INTRODUCE PHARMACEUTICAL QUALITY-MANAGEMENT SYSTEM IN THE PHARMACEUTICAL INDUSTRY |
$ 48,106 |
| SI/SYR/96/801 |
URGENT HIGH LEVEL ADVISORY ASSISTANCE FOR ESTABLISHMENT OF AN AGROCHEMICAL FORMULATION PLANT IN SYRIA |
$ 16,618 |
| MP/SYR/96/121 |
PHASING OUT CFCS AT GASTON BANNA AND SONS COMPANY |
$ 299,500 |
| MP/SYR/96/119 |
PHASING OUT CFC-11 AT DAKKAK COMPANY FLEXIBLE POLYURETHANE FOAM PLANT |
$ 96,553 |
| MP/SYR/96/086 |
INVESTMENT PROJECT FOR PHASING OUT CFCS AT KRAYEM COLD STORES COMPANY |
$ 635,372 |
| UC/SYR/96/074 |
PREPARATORY ASSISTANCE TO ESTABLISH A TEXTILE AND CLOTHING DESIGN CENTRE |
$ 6,616 |
| MP/SYR/96/024 |
PREPARATION OF AN INVESTMENT PROJECT IN THE AEROSOL SECTOR |
$ 24,254 |
| MP/SYR/96/014 |
PHASING OUT OF CFCS FROM MANUFACTURING OF DOMESTIC AND COMMERCIAL REFRIGERATORS AT KRAYEM BROTHERS COMPANY |
$ 1,058,017 |
| DP/SYR/96/004 |
QUALITY ASSURANCE ASSISTANCE - ISO 9000 |
$ 229,678 |
| DP/SYR/95/003, GC/SYR/95/A03, NT/SYR/95/003 |
TEXTILE AND CLOTHING DEVELOPMENT CENTRE |
$ 72,793 |
| SI/SYR/95/801 |
ASSISTANCE IN MODERNIZATION OF THE NATIONAL METROLOGY CALIBRATION SYSTEM |
$ 45,075 |
| MP/SYR/95/042 |
INVESTMENT PROJECT FOR PHASING OUT CFCS AT BARADA, GENERAL COMPANY FOR METALLIC INDUSTRY |
$ 894,058 |
| MP/SYR/95/041 |
INVESTMENT PROJECT FOR PHASING OUT OF CFCS AT PENGUIN (SYRIAN BATRIC COMPANY) |
$ 1,718,659 |
| MP/SYR/95/008 |
PREPARATION OF INVESTMENT PROJECT FOR PHASING-OUT OF CFCS IN MANUFACTURING OF REFRIGERATORS AT KRAYEM INT. CO. |
$ 14,289 |
| MP/SYR/95/007 |
PREPARATION OF INVESTMENT PROJECT FOR PHASING-OUT OF CFC 11 FROM THE MANUFACTURING OF PRE-FABRICATED SANDWICH PANELS AT KRAYEM COLD STORES CO. |
$ 13,596 |
| MP/SYR/95/006 |
PREPARATION OF INVESTMENT PROJECTS FOR PHASING OUT OF CFC-11 FROM THE SUBSECTOR OF FLEXIBLE FOAMS MANUFACTURING |
$ 20,000 |
| DP/SYR/95/003, GC/SYR/95/A03, NT/SYR/95/003 |
TEXTILE AND CLOTHING DEVELOPMENT CENTRE |
$ 420,294 |
| DP/SYR/95/003, GC/SYR/95/A03, NT/SYR/95/003 |
TEXTILE AND CLOTHING DEVELOPMENT CENTRE |
$ 12,350 |
| MP/SYR/94/412 |
PHASING OUT OF CFCS AT AL HAFEZ REFRIGERATOR COMPANY |
$ 2,883,277 |
| NC/SYR/94/01D |
STUDY ON INDUSTRIAL POLICIES/STRATEGIES |
$ 68,604 |
| MP/SYR/93/148 |
SUPPORT TO STRENGTHENING THE GENERAL COMMISSION FOR ENVIRONMENTAL AFFAIRS TO IMPLEMENT MONTREAL PROTOCOL RELATED ACTIVITIES |
$ 219,908 |
| MP/SYR/93/118 |
PREPARATION OF INVESTMENT PROJECT PROPOSALS FOR THE PHASE-OUT OF CFC-11 AND CFC -12 IN THE DOMESTIC REFRIGERATION INDUSTRY |
$ 34,995 |
| SI/SYR/92/801 |
TECHNICAL ADVISORY ASSISTANCE TO THE GENERAL COMPANY FOR TYRE INDUSTRIES |
$ 55,536 |
| DP/SYR/92/012 |
ESTABLISHMENT OF A NATIONAL CAD CENTRE FOR ENGINEERING AND TEXTILE INDUSTRY |
$ 38,143 |
| DP/SYR/92/009, NT/SYR/92/009 |
INTRODUCTION OF COMPUTER MANAGED MAINTENANCE SYSTEM INTO THE SYRIAN INDUSTRIAL SECTOR |
$ 35,150 |
| DP/SYR/92/009, NT/SYR/92/009 |
INTRODUCTION OF COMPUTER MANAGED MAINTENANCE SYSTEM INTO THE SYRIAN INDUSTRIAL SECTOR |
$ 505,498 |
| DU/SYR/92/008 |
INTEGRATED DEVELOPMENT OF THE NATIONAL PHARMACEUTICAL INDUSTRY |
$ 174,725 |
| DP/SYR/92/004, NT/SYR/92/004 |
PREPARATORY ASSISTANCE IN THE TREATMENT OF TANNERY WASTES IN ZABLATANI-DAMASCUS INDUSTRIAL AREA |
$ 427,169 |
| DP/SYR/92/004, NT/SYR/92/004 |
PREPARATORY ASSISTANCE IN THE TREATMENT OF TANNERY WASTES IN ZABLATANI-DAMASCUS INDUSTRIAL AREA |
$ 21,850 |
| SI/SYR/90/801 |
ASSISTANCE TO THE DEIR EZZOR PULP/PAPER MILL |
$ 42,782 |
| US/SYR/90/180 |
CONSULTANCY SERVICES REGARDING COMPUTER APPLICATIONS IN OFFICE AND INDUSTRY |
$ 35,398 |
| UC/SYR/89/241 |
PREPARATORY ASSISTANCE FOR THE ESTABLISHMENT OF A DEMONSTRATION PRODUCTION FOUNDRY |
$ 35,435 |
| UC/SYR/88/225 |
ADVISORY SERVICES TO THE SYRIAN ARAB REPUBLIC ON INDUSTRIAL STRATEGY |
$ 94,260 |
| DP/SYR/86/011 |
STRENGTHENING THE CAPABILITY OF THE SYRIAN SCIENTIFIC STUDIES AND RESEARCH CENTRE IN THE FIELD OF OPTICAL TECHNOLOGY |
$ 1,859,892 |
| DP/SYR/86/010 |
INDUSTRIAL QUALITY ASSURANCE |
$ 660,204 |
| DP/SYR/86/009 |
HIGH-LEVEL CONSULTANCIES AND TRAINING (IN COOPERATION WITH PROJECT DP/SYR/86/010) |
$ 735,686 |
|
| Total: 95 |
$ 24,142,633 |