| Project No(s). |
Title |
Expenditures |
| MPALG09006 |
PREPARATION FOR PILOT DEMONSTRATION PROJECT ON ODS WASTE MANAGEMENT AND DISPOSAL |
$ 24,868 |
| MPALG09005 |
PREPARATION FOR HCFC PHASE-OUT INVESTMENT ACTIVITIES (REFRIGERATION AND AIR-TO-AIR AIR-CONDITIONING SECTOR) |
$ 20,067 |
| MP/ALG/09/004 |
PREPARATION FOR HCFC PHASE-OUT INVESTMENT ACTIVITIES (POLYURETHANE FOAM SECTOR) |
$ 9,686 |
| MP/ALG/09/003 |
PREPARATION OF A HCFC PHASE-OUT PLAN (ADDITIONAL FUNDING) |
$ 49,097 |
| MP/ALG/09/002 |
NATIONAL PHASE-OUT PLAN (SECOND TRANCHE) |
$ 64,757 |
| GF/ALG/09/001 |
CAPACITY BUILDING FOR THE ENVIRONMENTALLY SOUND MANAGEMENT OF POPS AND THE DESTRUCTION OF PCB WASTES IN ALGERIA - PREPARATORY ASSISTANCE |
$ 167,660 |
| MP/ALG/08/002 |
PREPARATION OF A HCFC PHASE-OUT MANAGEMENT PLAN |
$ 83,829 |
| YAALG08001 |
PROGRAMMING MISSION FOR IP ALGERIA, PHASE II |
$ 21,795 |
| MP/ALG/07/003 |
NATIONAL PHASE-OUT PLAN (FIRST TRANCHE) |
$ 715,715 |
| MP/ALG/07/002 |
PROJECT PREPARATION FOR AN ODS PHASE-OUT MANAGEMENT PLAN |
$ 14,119 |
| MPALG06002 |
TECHNICAL ASSISTANCE TO PHASE OUT METHYL BROMIDE IN PULSES DISINFESTATIONS |
$ 49,726 |
| YA/ALG/06/001 |
INDEPENDENT EVALUATION OF THE INTEGRATED PROGRAMME IN ALGERIA |
$ 27,428 |
| MPALG05001 |
PREPARATION OF A NATIONAL ODS PHASE-OUT PLAN |
$ 23,405 |
| MP/ALG/04/122 |
CONVERSION FOR CFC-11 TO HCFC-141B AND CFC-12 TO HCFC-134A TECHNOLOGY IN THE LAST GROUP OF COMMERICAL REFRIGERATOR MANUFACTURES (REFRIGERATION SECTOR TERMINAL PROJECT) |
$ 483,099 |
| MPALG04017 |
REFRIGERANT MANAGEMENT PLAN TO PHASE OUT THE USE OF ODS IN REFRIGERATION AND AIR-CONDITIONING SECTOR 2004 PROGRAMME |
$ 512,105 |
| TE/ALG/04/001, TF/ALG/03/001, TF/ALG/04/001 |
SENSIBILISATION, FORMATION DES COMPETENCES ET RENFORCEMENT DES CAPACITES INSTITUTIONNELLES DES STRUCTURES EN CHARGE DE LA QUALITE, DE LA NORMALISATION ET DE LA CERTIFICATION, EN VUE DE L'AMELIORATION DE LA QUALITE DES PRODUITS, DE LA COMPETITIVITE DES ENT |
$ 1,160,584 |
| TEALG03A02,TFALG03A02 |
STRENGTHENING OF SUPPORT INFRASTRUCTURE AND ASSISTANCE TO THE UPGRADING OF SMES IN AGRO-FOOD INDUSTRY |
$ 189,600 |
| XA/ALG/03/644 |
INVESTMENT AND PARTNERSHIP PROMOTION |
$ 140,793 |
| XA/ALG/03/611, YA/ALG/03/418 |
SUPPORT FOR EARTHQUAKE REHABILITATION |
$ 64,970 |
| YA/ALG/03/461 |
STRENGTHENING OF SUPPORT AND ADVISORY SERVICES TO INDUSTRY |
$ 52,487 |
| XA/ALG/03/611, YA/ALG/03/418 |
SUPPORT FOR EARTHQUAKE REHABILITATION |
$ 45,838 |
| MP/ALG/03/027 |
REFRIGERANT MANAGEMENT PLAN TO PHASE OUT THE USE OF ODS IN REFRIGERATION AND AIR-CONDITIONING SECTOR (SECOND TRANCHE) |
$ 700,000 |
| TEALG03002,TFALG03002 |
RENFORCEMENT DES CAPACITE DES STRUCTURES D'APPUI ET ASSISTANCE A LA MISE A NIVEAU DES PME DE L'INDUSTRIE AGROALIMENTAIRE EN ALGERIE |
$ 710,951 |
| TE/ALG/04/001, TF/ALG/03/001, TF/ALG/04/001 |
SENSIBILISATION, FORMATION DES COMPETENCES ET RENFORCEMENT DES CAPACITES INSTITUTIONNELLES DES STRUCTURES EN CHARGE DE LA QUALITE, DE LA NORMALISATION ET DE LA CERTIFICATION, EN VUE DE L'AMELIORATION DE LA QUALITE DES PRODUITS, DE LA COMPETITIVITE DES ENT |
$ 46,115 |
| YA/ALG/02/406 |
ASSISTANCE A LA MISE A NIVEAU EN ALGERIE |
$ 10,113 |
| MP/ALG/02/093 |
REFRIGERANT MANAGEMENT PLAN TO PHASE OUT THE USE OF ODS IN THE REFRIGERATION AND AIR-CONDITIONING SECTOR (INCLUDES TRAINING OF CUSTOMS OFFICERS) |
$ 93,827 |
| MP/ALG/02/085 |
REFRIGERANT MANAGEMENT PLAN TO PHASE OUT THE USE OF ODS IN THE REFRIGERATION AND AIR-CONDITIONING SECTOR (INCLUDES: TRAINING IN GOOD REFRIGERANT MANAGEMENT PRACTICES, TRAINING OF CUSTOMS OFFICERS, AND NATIONAL RECOVERY AND RECYCLING) |
$ 106,173 |
| MP/ALG/02/084 |
CONVERSION FROM CFC-11 TO HCFC-141B AND CFC-12 TO HFC-134A TECHNOLOGY IN THE FIRST GROUP OF COMMERCIAL REFRIGERATOR MANUFACTURERS |
$ 201,619 |
| MP/ALG/02/002 |
PREPARATION OF INVESTMENT PROJECTS IN THE COMMERCIAL REFRIGERATION SECTOR (ADVANCE) |
$ 50,001 |
| GFALG02001 |
ENABLING ACTIVITIES TO FACILITATE EARLY ACTION ON THE IMPLEMENTATION OF THE STOCKHOLM CONVENTION ON PERSISTENT ORGANIC POLLUTANTS IN ALGERIA |
$ 495,085 |
| SF/ALG/01/A01 |
ESTABLISHING AN INFORMATION NETWORK: MINISTRY OF INDUSTRY AND DECENTRALIZED STRUCTURES |
$ 67,875 |
| UB/ALG/00/042, YA/ALG/00/434, XA/ALG/01/611 |
PROGRAMME INTEGRE ALGERIE |
$ 15,938 |
| MP/ALG/01/128 |
PROJECT PREPARATION TO REPLACE METHYL BROMIDE IN THE FUMIGATION OF DATES IN TEN UNITS |
$ 13,421 |
| MP/ALG/01/005 |
CONVERSION FROM CFC-11 TO HCFC-141B AND CFC-12 TO HFC-134A TECHNOLOGY IN THE MANUFACTURE OF COMMERCIAL REFRIGERATION AT THE SOCIETE DE REFRIGERATION ET DE CONDITIONNEMENT DE L'AIR |
$ 345,905 |
| SF/ALG/01/001 |
SEMINAIRE MISE A NIVEAU |
$ 17,931 |
| UB/ALG/00/042, YA/ALG/00/434, XA/ALG/01/611 |
PROGRAMME INTEGRE ALGERIE |
$ 70,000 |
| MP/ALG/00/116 |
STRATEGY FOR THE PREPARATION OF AN RMP |
$ 58,988 |
| UB/ALG/00/042, YA/ALG/00/434, XA/ALG/01/611 |
PROGRAMME INTEGRE ALGERIE |
$ 114,542 |
| MP/ALG/00/022 |
PROJECT PREPARATION IN THE FLEXIBLE FOAM SECTOR |
$ 19,999 |
| DP/ALG/00/003 |
RENFORCEMENT DES CAPACITES NATIONALES EN MATIERE DE QUALITE, NORMALISATION, CERTIFICATION ET ACCREDITATION EN ALGERIE |
$ 268,809 |
| US/ALG/99/154 |
PROJET PILOTE POUR LA MISE A NIVEAU ET L'AMELIORATION DE LA COMPETITIVITE DES PME EN ALGERIE |
$ 898,818 |
| MP/ALG/99/131 |
PROJECT PREPARATION IN THE COMMERCIAL REFRIGERATION SECTOR |
$ 3,020 |
| MP/ALG/99/118 |
PHASING OUT OF CFC-11 BY CONVERSION TO METHYLENE CHLORIDE IN THE MANUFACTURE OF FLEXIBLE POLYURETHANE SLABSTOCK FOAM AT ORANIA MOUSSE AMEUBLEMENT (OMA) |
$ 99,374 |
| MP/ALG/99/117 |
PHASING OUT OF CFC-11 BY CONVERSION TO METHYLENE CHLORIDE IN THE MANUFACTURE OF FLEXIBLE POLYURETHANE SLABSTOCK FOAM AT MATELAS MONDIAL |
$ 97,920 |
| MP/ALG/99/116 |
PHASING OUT OF CFC-11/CFC-12 BY CONVERSION TO HYDROCARBON TECHNOLOGY IN THE MANUFACTURE OF AEROSOLS AT FLOREAL |
$ 77,067 |
| MP/ALG/99/115 |
PHASING OUT OF CFC-11/CFC-12 BY CONVERSION TO HYDROCARBON TECHNOLOGY IN THE MANUFACTURE OF AEROSOLS AT COMPANY SACO |
$ 73,617 |
| MP/ALG/99/059 |
PROJECT PREPARATION IN THE FOAM SECTOR (FLEXIBLE) |
$ 17,980 |
| MP/ALG/99/047 |
PROJECT PREPARATION IN THE AEROSOL SECTOR |
$ 14,403 |
| MP/ALG/99/032 |
PHASING OUT OF CFC-11 BY CONVERSION TO METHYLENE CHLORIDE IN THE MANUFACTURE OF FLEXIBLE POLYURETHANE FOAM AT MATELAS ATLAS (SAM ATLAS) |
$ 120,060 |
| MP/ALG/99/031 |
PHASING OUT OF CFC-11 BY CONVERSION TO METHYLENE CHLORIDE IN THE MANUFACTURE OF FLEXIBLE POLYURETHANE FOAM AT KING'S MATELAS |
$ 110,141 |
| MP/ALG/99/013 |
PROJECT FORMULATION IN THE METHYL BROMIDE SECTOR |
$ 4,207 |
| YA/ALG/98/410 |
PREPARATORY ASSISTANCE FOR THE DEVELOPMENT OF A COOPERATION PROGRAMME THROUGH A UNIDO PROGRAMMING MISSION |
$ 16,354 |
| MP/ALG/98/094 |
REPLACEMENT OF CFC-12 WITH HFC-134A FOR DOMESTIC REFRIGERATION AT ENAPEM |
$ 164,442 |
| MP/ALG/98/093 |
PHASING OUT OF CFC-11 IN THE MANUFACTURE OF FLEXIBLE POLYURETHANE FOAM THROUGH THE USE OF METHYLENE CHLORIDE TECHNOLOGY AT ETS MAGHREB MOUSSE |
$ 95,993 |
| MP/ALG/98/044 |
PHASING OUT OF CFC-11 IN THE MANUFACTURE OF FLEXIBLE POLYURETHANE FOAM THROUGH THE USE OF METHYLENE CHLORIDE TECHNOLOGY AT ETS MATELAS DJURDJURA |
$ 81,856 |
| MP/ALG/98/043 |
REPLACEMENT OF CFC-12 WITH HFC-134A FOR COMMERCIAL REFRIGERATION AT E.N.A.P.A.T. |
$ 122,995 |
| MP/ALG/98/042 |
REPLACEMENT OF CFC-11 AND CFC-12 WITH HYDROCARBON IN THE AEROSOL SECTOR AT ETS DJADIR |
$ 147,491 |
| MP/ALG/97/160 |
PHASING OUT CFC-11 AT LA MOUSSE DU SUD FLEXIBLE POLYURETHANE FOAM PLANT |
$ 552,050 |
| MP/ALG/97/082 |
PHASING OUT CFC-11 AT SAMMO FLEXIBLE POLYURETHANE FOAM PLANT |
$ 97,360 |
| MP/ALG/97/081 |
PHASING OUT CFC-11 AT ETS LEULMI ESSAID FLEXIBLE POLYURETHANE FOAM PLANT |
$ 6,509 |
| MP/ALG/97/080 |
PHASING OUT CFC-11 AT SNAM FLEXIBLE POLYURETHANE FOAM PLANT |
$ 87,953 |
| MP/ALG/97/040 |
PROJECT FORMULATION OF INVESTMENT PROJECTS IN THE AEROSOL, FOAM AND REFRIGERATION SECTORS |
$ 47,310 |
| DG/ALG/97/002 |
APPUI AU PROGRAMME DE PRIVATISATION ET DE RESTRUCTURATION DES ENTREPRISES PUBLIQUES EN ALGERIE |
$ 382,125 |
| XA/ALG/96/622 |
ELABORATION D'UN PROGRAMME INTEGRE D'APPUI ET D'ASSISTANCE A LA RESTRUCTURATION INDUSTRIELLE ET AU REDRESSEMENT DES ENTREPRISES INDUSTRIELLES EN ALGERIE |
$ 94,191 |
| MP/ALG/96/193 |
PHASING OUT CFCS AT ETS COPHYD |
$ 51,733 |
| MP/ALG/96/192 |
PHASING OUT CFCS AT LABOARATOIRE BENDI |
$ 53,785 |
| MP/ALG/96/191 |
PHASING OUT CFCS AT ETABLISSEMENT HAS MOHAMED |
$ 82,018 |
| MP/ALG/96/190 |
PHASING OUT CFCS AT ETS WOUROUD |
$ 187,352 |
| MP/ALG/96/189 |
PHASING OUT CFCS AT VAGUE DE FRAICHEUR |
$ 164,624 |
| MP/ALG/96/085 |
PHASING OUT CFC-11 IN THE MANUFACTURE OF SANDWICH PANELS AT BATIMETAL BENI MANSOUR |
$ 496,650 |
| MP/ALG/96/084 |
PHASING OUT CFC-11 IN THE MANUFACTURE OF SANDWICH PANELS BY DISCONTINUOUS METHOD AT PROSIDER BERRAHAL |
$ 433,937 |
| MP/ALG/96/005 |
PHASING OUT CFCS AT ENTREPRISE NATIONALE DES DETERGENTS |
$ 614,851 |
| DP/ALG/96/002, NT/ALG/96/002 |
RENFORCEMENT DE L'AGENCE DE PROMOTION, DE SOUTIEN ET DE SUIVI DE L'INVESTISSEMENT |
$ 54,150 |
| DP/ALG/96/002, NT/ALG/96/002 |
RENFORCEMENT DE L'AGENCE DE PROMOTION, DE SOUTIEN ET DE SUIVI DE L'INVESTISSEMENT |
$ 524,624 |
| SF/ALG/96/001 |
ORGANISATION D'UN ATELIER DE SENSIBILISATION SUR LA STRATEGIE DE RECENTRAGE ET D'EXTERNALISATION DES ACTIVITES ANNEXES DE LA SOCIETE ALGERIENNE SONATRACH |
$ 11,790 |
| MP/ALG/95/130 |
PROJECT FORMULATION FOR PHASING OUT ODS IN SMALL AND MEDIUM SCALE INDUSTRIES |
$ 48,591 |
| MP/ALG/95/123 |
INVESTMENT PROJECT FOR PHASING OUT OF CFCS AT ENAD |
$ 109,294 |
| MP/ALG/95/028 |
PROJECT FORMULATION OF ESTABLISHMENT OF A NATIONAL CENTRE FOR RECOVERY AND RECYCLING OF CFC-11, CFC-12 AND CFC-502 |
$ 16,747 |
| MP/ALG/95/027 |
PREPARATION OF AN INVESTMENT PROJECT FOR THE PHASE-OUT OF CFC-11 IN THE MANUFACTURE OF SANDWICH PANELS AT PROSIDER (ANNABA-ALGERIA) |
$ 23,416 |
| MP/ALG/95/026 |
PREPARATION OF AN INVESTMENT PROJECT FOR CFC PHASE-OUT IN THE PRODUCTION OF RIGID FOAM AT BATIMETAL |
$ 20,755 |
| MP/ALG/95/025 |
INVESTMENT PROJECT FOR PHASING OUT CFCS AT ENTERPRISE NATIONALE DES INDUSTRIES DE L'ELECTROMENAGER |
$ 6,506,631 |
| DP/ALG/95/004, NT/ALG/95/004 |
DEVELOPPEMENT D'UN RESEAU DE BOURSES DE SOUS-TRAITANCE INDUSTRIELLE |
$ 32,300 |
| DP/ALG/95/004, NT/ALG/95/004 |
DEVELOPPEMENT D'UN RESEAU DE BOURSES DE SOUS-TRAITANCE INDUSTRIELLE |
$ 309,334 |
| MP/ALG/94/409 |
PREPARATORY ASSISTANCE FOR THE PHASE-OUT OF CFCS IN THE MANUFACTURE OF AEROSOLS AND SOLVENTS AT ENAD, ALGERIA |
$ 19,951 |
| MP/ALG/94/406 |
PREPARATORY ASSISTANCE FOR ELIMINATION OF CFCS IN MANUFACTURING DOMESTIC REFRIGERATORS AND FREEZERS AT ENIEM |
$ 24,325 |
| DG/ALG/94/006, NU/ALG/94/006 |
APPUI A LA MISE EN PLACE ET AU RENFORCEMENT DES CAPACITES NATIONALES DANS LE DOMAINE DE L'ENVIRONNEMENT ET A L'INTRODUCTION DE L'EDUCATION ENVIRONNEMENTALE DANS L'ENSEIGNEMENT PRIMAIRE ET SECONDAIRE |
$ 49,612 |
| DG/ALG/94/006, NU/ALG/94/006 |
APPUI A LA MISE EN PLACE ET AU RENFORCEMENT DES CAPACITES NATIONALES DANS LE DOMAINE DE L'ENVIRONNEMENT ET A L'INTRODUCTION DE L'EDUCATION ENVIRONNEMENTALE DANS L'ENSEIGNEMENT PRIMAIRE ET SECONDAIRE |
$ 268,255 |
| US/ALG/93/086 |
INTEGRATION INDUSTRIELLE DANS LE SECTEUR AUTOMOBILE ET COMPOSANTS PAR LE DEVELOPPEMENT DU PARTENARIAT ENTRE ENTREPRISES ALGERIENNES ET ITALIENNES - PHASE PREPARATOIRE POUR US/ALG/91/100 |
$ 73,014 |
| DP/ALG/93/008 |
APPUI A L'ELABORATION DE STRATEGIES INDUSTRIELLES CONCERTEES (ASSISTANCE PREPARATOIRE) |
$ 75,412 |
| SI/ALG/92/801 |
HIGH LEVEL ADVISORY SERVICES IN PROMOTION OF SMALL AND MEDIUM SCALE INDUSTRIES |
$ 6,588 |
| NC/ALG/92/049 |
STRENGTHENING HUMAN RESOURCES FOR THE IMPLEMENTATION OF ENVIRONMENT RELATED STRATEGIES IN PRIORITY INDUSTRIAL AREAS |
$ 38,510 |
| DP/ALG/92/015 |
REFORME DU CADRE ET DES INSTRUMENTS RELATIFS AUX INVESTISSEMENTS EN ALGERIE |
$ 411,731 |
| US/ALG/91/008 |
ASSISTANCE AU DEVELOPPEMENT DE LA PRODUCTION DE REFRACTAIRES |
$ 55,359 |
| DP/ALG/91/001 |
PROJET D'APPUI AU PROGRAMME DU DELEGUE ALGERIEN AUPRES DU SERVICE DE L'ONUDI EN FRANCE (SOF) |
$ 150,032 |
| SI/ALG/90/801 |
HIGH LEVEL ADVISORY SERVICE FOR THE OPTIMIZATION AND RENTABILIZATION OF THE ANTIBIOTIC COMPLEX AT MEDEA |
$ 44,242 |
| US/ALG/90/127 |
ETUDE DE FAISABILITE POUR LA CREATION D'UNE INSTITUTION FINANCIERE SPECIALISEE (I.F.S.) |
$ 109,646 |
| DP/ALG/90/019 |
MISE EN PLACE D'UNE BOURSE DE SOUSTRAITANCE INDUSTRIELLE ASSISTANCE PREPARATOIRE |
$ 137,888 |
| DP/ALG/90/018, DC/ALG/90/018 |
DEVELOPPEMENT DES CAPACITES NATIONALES DE MAITRISE DE LA QUALITE DES PRODUITS INDUSTRIELS |
$ 163,060 |
| DP/ALG/90/018, DC/ALG/90/018 |
DEVELOPPEMENT DES CAPACITES NATIONALES DE MAITRISE DE LA QUALITE DES PRODUITS INDUSTRIELS |
$ 677,542 |
| DP/ALG/90/003 |
REPRISE ET ACHEVEMENT DU PROJET USINE-PILOTE POUR LA PRODUCTION DE SOLUTES DE PERFUSION INTRAVEINEUX (ASSISTANCE PREPARATOIRE) |
$ 299,834 |
| SI/ALG/89/801 |
URGENT ASSISTANCE FOR THE ESTABLISHMENT OF A PILOT DEMONSTRATION PLANT FOR PRODUCTION OF INTRAVENOUS FLUIDS |
$ 142,726 |
| DP/ALG/88/020 |
CONSULTING INDUSTRIEL (ENORI) |
$ 417,550 |
| DP/ALG/88/014 |
FABRICATION D'OUTILLAGE |
$ 91,712 |
| DC/ALG/88/013 |
ASSISTANCE A L'INMA DANS LE DOMAINE DE L'INGENIERIE DE MAINTENANCE (MULTIFUND TO DP/ALG/88/013) |
$ 1,511 |
| DP/ALG/88/013 |
ASSISTANCE A L'INMA DANS LE DOMAINE DE L'INGENIERIE DE MAINTENANCE (MULTIFUND TO DC/ALG/88/013) |
$ 879,860 |
| DP/ALG/87/029 |
Contrôle de la qualité des produits industriels |
$ 54,376 |
| DP/ALG/87/028 |
INTRODUCTION D'UN SYSTEME INFORMATIQUE DE GESTION INTEGREE DE LA PRODUCTION ET DE LA MAINTENANCE EN TEMPS REEL (SGPM) A SIDER |
$ 1,115,327 |
| DP/ALG/87/025 |
ETABLISSEMENT D'UNE USINE-PILOTE POUR LE PRODUCTION DE SOLUTES DE PERFUSION INTRAVEINEUX |
$ 1,465,823 |
| DP/ALG/87/023 |
MEETING ON CO-OPERATIVE ARRANGEMENTS AMONG DEVELOPING COUNTRIES ON AGRICULTURAL MACHINERY, ALGIERS, OCT. 1987 |
$ 20,500 |
| DP/ALG/87/016 |
INTEGRATION ET INNOVATION INDUSTRIELLES PAR LA MOBILISATION DE L'INGENIERIE NATIONALE BASEE SUR LA METHODE ACT ET LE DEVELOPPEMENT DE LA SOUS-TRAITANCE |
$ 276,392 |
| DP/ALG/86/023 |
DEVELOPPEMENT DES CAPACITES DE L'ENORI EN MATIERE D'INFORMATION INDUSTRIELLE |
$ 202,407 |
| DP/ALG/86/022 |
Développement et promotion des industries de loisirs (DEJIMAS) |
$ 386,017 |
| DP/ALG/86/021 |
ETUDES DE PRE-INVESTISSEMENT ET PROMOTION DE PROJETS INDUSTRIELS (EDIL) |
$ 527,987 |
| DP/ALG/86/019 |
Assistance à l'Institut supérieur de gestion et de planification dans l'élaboration d'une méthodologie d'évaluation et de selection des projets d'investissement |
$ 257,981 |
| DP/ALG/86/010 |
MISE EN OEUVRE DU PLAN DE DEVELOPPEMENT DE L'INDUSTRIE PHARMACEUTIQUE |
$ 1,029,772 |
| DP/ALG/86/009 |
Développement des capacités de l'Entreprise nationale d'organisation et d'information (ENORI) en matière de consulting industriel |
$ 310,810 |
| DP/ALG/86/008 |
Plan directeur de développement de l'industrie chimique |
$ 613,174 |
| DP/ALG/86/007 |
Etude sur la production d'articles de conditionnement en verre et plastique pour l'industrie pharmaceutique |
$ 63,563 |
| DU/ALG/86/003 |
ASSISTANCE TO INSTITUT SUPERIEUR DE GESTION ET DE PLANIFICATION (EXEC.AGENCIES DTCD/UNIDO) |
$ 137,182 |
| DP/ALG/86/002 |
Strengthening of engineering capabilities at the Ministry of Heavy Industry |
$ 19,003 |
|
| Total: 120 |
$ 31,103,377 |