| Project No(s). |
Title |
Expenditures |
| MP/VEN/11/001 |
HCFC PHASE-OUT MANAGEMENT PLAN (STAGE I, FIRST TRANCHE) |
$ 504,280 |
| MPVEN10002 |
PREPARATION OF HCFC PHASE-OUT INVESTMENT ACTIVITIES (REFRIGERATION AND AIR CONDITIONING MANUFACTURING SECTOR) |
$ 99,685 |
| MPVEN10001 |
PREPARATION FOR HCFC PHASE-OUT INVESTMENT ACTIVITIES (FOAM SECTOR) |
$ 99,996 |
| MPVEN09001 |
NATIONAL CFC PHASE-OUT PLAN: 2009 WORK PROGRAMME |
$ 513,503 |
| MP/VEN/08/001 |
PREPARATION OF A HCFC PHASE-OUT MANAGEMENT PLAN |
$ 173,032 |
| MPVEN07002 |
NATIONAL CFC PHASE-OUT PLAN FOR VENEZUELA, 3RD TRANCHE |
$ 2,071,507 |
| XPVEN07001 |
PROGRAMMING MISSION FOR IP VENEZUELA |
$ 15,265 |
| MPVEN05003 |
NATIONAL CFC PHASE-OUT PLAN: 2ND TRANCHE |
$ 1,631,831 |
| MP/VEN/05/002 |
TRAINING AND AWARENESS WORKSHOP IN THE PROCESS AGENTS (TCA) SECTOR |
$ 38,995 |
| MP/VEN/05/001 |
TRAINING AND AWARENESS WORKSHOP IN THE FUMIGANTS SECTOR (METHYL BROMIDE) |
$ 40,000 |
| XP/VEN/04/049 |
NATIONAL PROJECT COORDINATOR FOR THE UNIDO-VENEZUELA COOPERATION PROGRAMME |
$ 7,865 |
| MPVEN04033 |
NATIONAL CFC PHASE-OUT PLAN (FIRST TRANCHE) |
$ 1,895,062 |
| XP/VEN/03/C04 |
UNIDO COOPERATION PROGRAMME FOR VENEZUELA |
$ 46,914 |
| XP/VEN/03/B04 |
UNIDO COOPERATION PROGRAMME FOR VENEZUELA |
$ 38,725 |
| XP/VEN/03/A04 |
UNIDO COOPERATION PROGRAMME FOR VENEZUELA |
$ 27,141 |
| XP/VEN/03/013 |
CAPACITY-BUILDING FOR TECHNOLOGY INCUBATION AND INNOVATION IN VENEZUELA |
$ 96,127 |
| XP/VEN/03/012 |
ASSISTANCE IN THE DEVELOPMENT OF THE VENEZUELAN INTERNATIONAL SYSTEM FOR INVESTMENT, TRADE AND TECHNOLOGY PROMOTION |
$ 74,988 |
| GFVEN03009 |
ENABLING ACTIVITIES TO FACILITATE EARLY ACTION ON THE IMPLEMENTATION OF THE STOCKHOLM CONVENTION ON PERSISTENT ORGANIC POLLUTANTS (POPS) IN THE REPUBLIC OF VENEZUELA |
$ 466,767 |
| MP/VEN/02/160 |
PHASING OUT CFC-11 BY CONVERSION TO HCFC-141B AS A BLOWING AGENT IN THE MANUFACTURE OF RIGID P.U. FOAMS: UMBRELLA NO. 2 PROJECT |
$ 764,653 |
| MP/VEN/02/025 |
PHASING OUT CFC-11 BY CONVERSION TO WATER SYSTEM AS A BLOWING AGENT IN THE MANUFACTURE OF FLEXIBLE POLYURETHANE FOAMS AT MANUFACTURAS ENVETA, C.A. CUMANA |
$ 198,882 |
| MP/VEN/01/232 |
PREPARATORY ASSISTANCE FOR CFC PHASE-OUT IN THE FOAM AND COMMERCIAL REFRIGERATION SECTOR (ADVANCE) |
$ 95,000 |
| MP/VEN/01/136 |
PHASING OUT CFC-11 BY CONVERSION TO HCFC-141B AS A BLOWING AGENT IN THE MANUFACTURE OF RIGID POLYURETHANE FOAMS (UMBRELLA NO. 1) (FRIMAC, FRIZER, EL CONTROL, INCUMACA, FRIVE, LUNGER, PROFIBRA, RECOVENCA, REFRIVEN, REQUIVEN, TEFIVEN AND VANGER) |
$ 366,695 |
| MP/VEN/01/039 |
PREPARATION OF AN INVESTMENT PROJECT IN THE FOAM SECTOR (INTEGRAL SKIN) |
$ 19,773 |
| MP/VEN/00/156 |
PHASE OUT OF CFC-12 WITH HFC-134A AND CFC-11 WITH HCFC-141B AT SEVEN COMMERCIAL REFRIGERATION COMPANIES (UMBRELLA PROJECT) |
$ 318,913 |
| MP/VEN/00/129 |
PREPARATION OF INVESTMENT PROJECT IN THE REFRIGERATION SECTOR (DOMESTIC/COMMERCIAL) |
$ 29,762 |
| MP/VEN/00/125 |
STRATEGY FOR THE PREPARATION OF A REFRIGERANT MANAGEMENT PLAN |
$ 67,088 |
| MP/VEN/00/102 |
PHASING OUT CFC-11 WITH HCFC-141B AT FRIOBOX IN THE PRODUCTION OF RIGID PU PANELS |
$ 8,829 |
| MP/VEN/00/101 |
PHASING OUT CFC-11 WITH HCFC-141B AT NEVECOR IN THE PRODUCTION OF RIGID PU PANELS |
$ 198,375 |
| MP/VEN/00/052 |
PREPARATION OF INVESTMENT PROJECT IN THE COMMERCIAL REFRIGERATION SECTOR |
$ 19,876 |
| MP/VEN/00/028 |
PREPARATION OF INVESTMENT PROJECT IN THE RIGID FOAM SECTOR |
$ 25,000 |
| MP/VEN/99/170 |
PHASING OUT OF CFC-12 WITH HFC-134A AND CFC-11 WITH HCFC-141B AT FIVE COMMERCIAL REFRIGERATION COMPANIES (UMBRELLA PROJECT) |
$ 405,132 |
| MP/VEN/99/169 |
PHASING OUT OF CFC-12 WITH HFC-134A AND CFC-11 WITH HCFC-141B AT THREE DOMESTIC REFRIGERATION COMPANIES (UMBRELLA PROJECT) |
$ 295,741 |
| MP/VEN/99/160 |
PHASING OUT OF CFC-11 WITH HCFC-141B AT NOVEMECA IN THE PRODUCTION OF RIGID PU PANELS |
$ 69,255 |
| MP/VEN/99/159 |
PHASING OUT OF CFC-11 WITH HCFC-141B AT AMERIO INDUSTRIAL S.A. IN THE PRODUCTION OF RIGID PU PANELS |
$ 87,866 |
| MP/VEN/99/108 |
PHASING OUT OF CFC-12 AT FANDEC C.A. (EPSR FOAM) |
$ 290,481 |
| MP/VEN/99/064 |
PREPARATION OF INVESTMENT PROJECT IN THE COMMERCIAL REFRIGERATION SECTOR |
$ 24,676 |
| MP/VEN/99/063 |
PREPARATION OF INVESTMENT PROJECT IN THE REFRIGERATION, MOBILE AIR-CONDITIONING AND COMPRESSOR SECTOR |
$ 19,888 |
| MP/VEN/99/051 |
PREPARATION OF INVESTMENT PROJECT IN THE FOAM SECTOR (POLYSTYRENE/POLYETHYLENE) |
$ 19,964 |
| MP/VEN/99/049 |
PREPARATION OF INVESTMENT PROJECT IN THE FOAM SECTOR (RIGID POLYURETHANE) |
$ 10,000 |
| MP/VEN/99/048 |
PREPARATION OF INVESTMENT PROJECT IN THE FOAM SECTOR (INTEGRAL SKIN) |
$ 20,000 |
| MP/VEN/99/045 |
PHASING OUT OF CFC-11 BY 100 PER CENT WATER BLOWN SYSTEM IN THE PRODUCTION OF MOULDED INTEGRAL SKIN FLEXIBLE PU FOAM AT FANESI |
$ 157,883 |
| MP/VEN/99/044 |
PHASING OUT CFC-11 WITH HCFC-141B IN THE PRODUCTION OF RIGID PU PANELS AT FRICAVA |
$ 115,383 |
| MP/VEN/99/029 |
WORKSHOP ON ALTERNATIVES TO METHYL BROMIDE IN TOBACCO CULTIVATION |
$ 40,000 |
| MP/VEN/98/164 |
PREPARATION OF INVESTMENT PROJECT IN THE FOAM SECTOR (RIGID POLYURETHANE) FOR FANESI BARQUISIMETO |
$ 9,944 |
| MP/VEN/98/097 |
PHASING OUT CFC-11 WITH HCFC-141B AT LIDERFRIO IN THE PRODUCTION OF RIGID PU PANELS |
$ 107,850 |
| MP/VEN/98/053 |
PHASING OUT CFC-11 WITH HCFC-141B AT TECNOFRIGO IN THE PRODUCTION OF RIGID PU PANELS |
$ 71,947 |
| MP/VEN/98/052 |
PHASING OUT CFC-11 AND CFC-12 WITH HCFC-141B AND HFC-134A AT INVITREL IN THE MANUFACTURE OF COMMERCIAL REFRIGERATION EQUIPMENT |
$ 417,380 |
| XP/VEN/98/017 |
POLICIES FOR SUSTAINABLE COMPETITIVENESS AND ENTREPRENEURIAL DEVELOPMENT OF THE AUTOMOBILE INDUSTRY |
$ 40,296 |
| MP/VEN/97/181 |
PHASING OUT ODS AT INDUSTRIAS TODOS C.A.: CARACAS |
$ 137,520 |
| MP/VEN/97/109 |
PHASING OUT ODS AT DANIVEN C.A. |
$ 104,030 |
| MP/VEN/97/108 |
PHASING OUT ODS AT VENIBER C.A. |
$ 164,530 |
| MP/VEN/97/107 |
PHASING OUT ODS AT DECOCAR C.A. |
$ 126,615 |
| MP/VEN/97/039 |
PROJECT FORMULATION OF INVESTMENT PROJECTS IN THE FOAM SECTOR |
$ 29,073 |
| SI/VEN/94/801 |
ADVISORY ASSISTANCE ON INTRODUCTION OF ALTERNATIVE GOLD MINING AND EXTRACTION TECHNIQUES AVOIDING MERCURY POLLUTION |
$ 46,538 |
| NT/VEN/94/003 |
TSS-2: Evaluation of EMPRETEC project in Venezuela - Creation and development of small and medium enterprises (SMEs) with technological basis |
$ 10,528 |
| SI/VEN/93/801 |
REDUCTION OF THE ENVIRONMENTAL HAZARD OF RED MUD DISPOSAL AT CVG INTERALUMINA |
$ 90,443 |
| XP/VEN/92/076 |
VISIT TO UNIDO OF MS. MARIELVI CHIRINOS (CORDIPLAN (OFICINA CENTRAL DE COORDINACION Y PLANIFICACION) |
$ 899 |
| DG/VEN/92/004 |
EVALUACION DE LA COMPETITIVIDAD PARA FAVORECER LA INVERSION EXTRANJERA |
$ 72,345 |
| UC/VEN/91/189 |
PRE-INVESTMENT ADVISORY SERVICES FOR THE SELECTION OF RAW MATERIALS AND TECHNOLOGY FOR PROCESSING LOCAL ALUMINA INTO REFRACTORY GRADE ALUMINA SILICATES |
$ 48,286 |
| NT/VEN/91/003 |
PREPARACION DE PROGRAMAS DE APOYO Y SEGUIMIENTO A LAS EMPRESAS (RELACIONADO CON EL PROYECTO EMPRETEC DP/VEN/91/003) |
$ 18,840 |
| TF/VEN/91/002 |
Associate expert (Mr. Plomp) (related to US/RLA/90/004) |
$ 59,540 |
| TF/VEN/91/001 |
Associate expert (Ms. Zaehler) (related to US/RLA/90/004) |
$ 61,581 |
| UC/VEN/89/216 |
APOYO A LA FORMULACION DE UN PROGRAMA DE RECONVERSION INDUSTRIAL EN EL MINISTERIO DE FOMENTO |
$ 144,888 |
| DP/VEN/89/011 |
APOYO A LA FORMULACION DE UN PROGRAMA DE RECONVERSION INDUSTRIAL EN EL MINISTERIO DE FOMENTO (MULTIFUND TO UC/VEN/89/216; TOTAL PROJ.BUDGET $391,250) |
$ 241,056 |
| US/VEN/88/242 |
PROJET DE COOPERATION ENTRE LE VENEZUELA ET LA FRANCE DANS LE DOMAINE AGRO- INDUSTRIEL. |
$ 267,421 |
| DC/VEN/87/012 |
Apoyo al Ministerio de Fomento en la Formulacion de Politica Industrial (continuation of DC/VEN/84/004) (multifund to DP/VEN/87/012) |
$ 363 |
| DP/VEN/87/001 |
Fortalecimiento institucional de FINTEC |
$ 51,761 |
| DC/VEN/86/001 |
Apoyo a la estrategia de desarrollo de la industria de bienes de capital (multifund to DP/VEN/86/001) (continuation of DC/VEN/80/003) (Associated Agency: UNCTAD) |
$ 81,443 |
| DP/VEN/86/001 |
Apoyo a la estrategia de desarrollo de la industria de bienes de capital (continuation of DP/VEN/80/003) (multifund to DC/VEN/86/001) (Associated Agency: UNCTAD) |
$ 500,941 |
|
| Total: 69 |
$ 14,416,835 |