Project No(s). Title Expenditures
SE/SYR/11/002 INDUSTRIAL MODERNIZATION AND UPGRADING PROGRAMME (IMUP) - PHASE II $ 286,623 
TESYR11001 INDUSTRIAL MODERNIZATION AND UPGRADING PROGRAMME - BRIDGING FUNDS $ 81,662 
MPSYR10004 PHASE-OUT OF HCFC-22 AND HCFC-141B FROM THE MANUFACTURE OF UNITARY AIR-CONDITIONING EQUIPMENT AND RIGID POLYURETHANE INSULATION PANELS AT AL HAFEZ GROUP $ 403,595 
DGSYR10002,XPSYR10003 FORMULATION OF THE AL-GHAB DEVELOPMENT PROGRAMME (AGRO-INDUSTRIES PILLAR) $ 38,149 
DGSYR10002,XPSYR10003 FORMULATION OF THE AL-GHAB DEVELOPMENT PROGRAMME (AGRO-INDUSTRIES PILLAR) $ 179,914 
MPSYR10001 PREPARATION FOR HCFC PHASE-OUT INVESTMENT ACTIVITIES (FOAM SECTOR) $ 39,929 
MP/SYR/09/003 PREPARATION FOR HCFC PHASE-OUT INVESTMENT ACTIVITIES (REFRIGERATION MANUFACTURING SECTOR) $ 58,771 
MP/SYR/09/002 NATIONAL CFC PHASE-OUT PLAN FOR SYRIA (THIRD TRANCHE) $ 23,606 
MPSYR09001 EXTENSION OF INSTITUTIONAL STRENGTHENING (PHASE IV) $ 42,569 
MPSYR08002 NATIONAL CFC PHASE-OUT PLAN $ 170,000 
MPSYR08001 PREPARATION OF A HCFC PHASE-OUT MANAGEMENT PLAN $ 136,247 
XPSYR07001 INDEPENDENT EVALUATION OF THE INTEGRATED PROGRAMME IN SYRIA $ 29,421 
MP/SYR/06/002 NATIONAL CFC PHASE-OUT PLAN FOR SYRIA (FIRST TRANCHE) $ 429,482 
MP/SYR/06/001 METHYL BROMIDE NATIONAL PHASE-OUT PLAN (SOIL FUMIGATION) $ 184,890 
TESYR05B03 INDUSTRIAL MODERNIZATION AND UPGRADING PROGRAMME - TEXTILES $ 315,951 
TE/SYR/05/A03 INDUSTRIAL MODERNIZATION AND UPGRADING PROGRAMME $ 75,871 
DP/SYR/05/006 SUPPORT TO THE IMPLEMENTATION OF THE UNIDO INTEGRATED PROGRAMME "MADE IN SYRIA" INDUSTRIAL DEVELOPMENT STRATEGY - COMPONENT 1, COMPLEMENTARY PHASE $ 35,680 
MP/SYR/05/005 DEMONSTRATION PROJECT ON THE REPLACEMENT OF CFC CENTRIFUGAL CHILLERS $ 375,396 
MPSYR05004 PHASE-OUT METHYL BROMIDE IN GRAIN FUMIGATION (THIRD TRANCHE) $ 426,808 
TESYR05003,TFSYR05003 INDUSTRIAL MODERNIZATION AND UPGRADING PROGRAMME $ 1,553,203 
MPSYR05002 EXTENSION OF INSTITUTIONAL STRENGTHENING: PHASE III $ 202,816 
MP/SYR/05/001 PREPARATION OF CFC-PHASE-OUT PLAN INCLUDING METHYL BROMIDE $ 68,101 
MPSYR03107 PHASE-OUT OF METHYL BROMIDE IN GRAIN STORAGE (SECOND TRANCHE) $ 350,153 
XP/SYR/03/018 SEED MONEY FOR IP SYRIA $ 68,000 
US/SYR/03/009, US/SYR/04/009 TECHNO-ECONOMIC STUDY ON THE ESTABLISHMENT OF A FULLY VERTICAL TEXTILE AND GARMENT FACTORY IN TARTOUS $ 2,030 
XP/SYR/03/003 SEED MONEY FOR IP SYRIA $ 80,998 
MP/SYR/02/159 PLAN FOR ELIMINATION OF CFCS IN THE REFRIGERATION MANUFACTURING SECTOR (DOMESTIC REFRIGERATION) $ 352,574 
MP/SYR/02/158 PHASING OUT OF CFC-12 BY CONVERSION TO N-BUTANE AS A BLOWING AGENT IN THE MANUFACTURING OF EXTRUDED POLYSTYRENE (EPS) FOAM FOR PACKING PURPOSES AT SHANKO AND PARTNERS CO. $ 132,201 
MP/SYR/02/024 PREPARATION OF A NATIONAL ODS PHASE-OUT PLAN $ 3,156 
MP/SYR/02/023 PREPARATION OF AN INVESTMENT PROJECT IN THE EXTRUDED POLYSTYRENE FOAM SECTOR $ 14,920 
DP/SYR/02/006 PREPARATORY ASSISTANCE TO SUPPORT GOVERNMENT REFORMS OF PUBLIC INDUSTRIES (UNIDO PROGRAMME SUPPORT) $ 413,246 
MPSYR01182 PHASING OUT THE USE OF METHYL BROMIDE IN GRAIN STORAGE (FIRST TRANCHE) $ 300,000 
MP/SYR/01/135 CONVERSION FROM CFC-11 TO METHYLENE CHLORIDE IN THE PRODUCTION OF FLEXIBLE SLABSTOCK FOAM AT AL-MUZAYEK $ 106,790 
MP/SYR/01/078 RENEWAL OF INSTITUTIONAL STRENGTHENING: PHASE II $ 191,883 
XP/SYR/01/018 PROGRAMMING MISSION TO SYRIA $ 7,260 
MP/SYR/01/014 PHASING OUT CFC-11 AND 12 IN THE MANUFACTURE OF HAIR LACQUERS BY CONVERSION TO HYDROCARBON PROPELLANT AT BADRAN & CO. $ 68,640 
MP/SYR/01/013 PHASING OUT CFC-12 IN THE MANUFACTURE OF HAIR LACQUERS BY CONVERSION TO HYDROCARBON PROPELLANT AT MAHMOUD HAMIDA $ 46,201 
MP/SYR/01/012 PHASING OUT CFC-11 AND 12 IN THE MANUFACTURE OF HAIR SPRAYS BY CONVERSION TO HYDROCARBON PROPELLANT AT KHADJI & ZAHKA $ 48,370 
MP/SYR/01/011 PHASING OUT CFC-12 IN THE MANUFACTURE OF INSECTICIDES BY CONVERSION TO HYDROCARBON PROPELLANT AT CHEIKH GHAZAL INSECTICIDE PLANT $ 86,528 
MP/SYR/01/004 CONVERSION FROM CFC-11 TO HCFC-141B IN THE PRODUCTION OF RIGID FOAM PANELS AT BASSAM BAGHDAN $ 124,698 
TF/SYR/01/001 IPU SYRIA $ 46,153 
MP/SYR/00/108 PREPARATION OF A PROJECT IN THE FUMIGANT (METHYL BROMIDE) SECTOR FOR GRAIN FUMIGATION $ 14,643 
MP/SYR/00/099 PREPARATION OF A PROJECT IN THE FLEXIBLE FOAM SECTOR $ 19,974 
MP/SYR/00/098 CONVERSION FROM CFC-11 TO CYCLOPENTANE IN THE PRODUCTION OF RIGID FOAM PANELS AT NATIONAL POLYURETHANE COMPANY (N.P.C.) $ 426,104 
MP/SYR/99/114 CONVERSION FROM CFC-11 TO HCFC-141B AND CFC-12 TO HFC-134A IN THE PRODUCTION OF REFRIGERATORS AND FREEZERS AT ALAMAN CO. $ 179,027 
MP/SYR/99/113 CONVERSION FROM CFC-11 TO HCFC-141B AND CFC-12 TO HFC-134A IN THE PRODUCTION OF REFRIGERATORS AND FREEZERS AT GOLDEN PENGUIN CO. $ 195,222 
MP/SYR/99/041 PROJECT PREPARATION OF INVESTMENT PROJECTS IN THE AEROSOL SECTOR $ 6,641 
MP/SYR/99/015 PROJECT PREPARATION OF INVESTMENT PROJECTS IN THE DOMESTIC REFRIGERATION SECTOR $ 17,144 
MP/SYR/98/163 PREPARATION OF INVESTMENT PROJECT FOR NATIONAL POLYURETHANE COMPANY IN DAMASCUS AND OTHERS IN RIGID FOAM SECTOR $ 14,763 
MP/SYR/98/095 PHASING OUT CFCS AT AL-FAJER COMPANY $ 168,926 
MP/SYR/98/092 PHASING OUT CFC-11 IN MANUFACTURE OF FLEXIBLE PU SLABSTOCK FOAM THROUGH THE USE OF CO2 BLOWING TECHNOLOGY AT NATIONAL POLYURETHANE COMPANY $ 543,918 
MP/SYR/98/091 PHASING OUT CFC-11 IN MANUFACTURE OF FLEXIBLE PU SLABSTOCK FOAM THROUGH THE USE OF METHYLENE CHLORIDE AS BLOWING AGENT AT CHAAR BROS COMPANY $ 98,169 
MP/SYR/98/055 PHASING OUT CFCS AT MARIZA CO. $ 204,443 
MP/SYR/98/028 DEMONSTRATION PROJECT: ALTERNATIVES TO THE USE OF METHYL BROMIDE IN HORTICULTURE AND COMMODITIES FUMIGATION $ 476,567 
MP/SYR/97/200 PREPARATION OF INVESTMENT PROJECT IN THE AEROSOL SECTOR AT NWEYLATI AL FAYER $ 14,481 
MP/SYR/97/180 PHASING OUT OF CFC-11 FROM FLEXIBLE SLABSTOCK FOAM MANUFACTURING AT AKAL FACTORY $ 510,131 
MP/SYR/97/172 PHASING OUT CFCS AT DINA COSMETICS $ 228,022 
MP/SYR/97/171 PHASING OUT CFCS AT LABORATORIES KOSMETO $ 173,290 
MP/SYR/97/112 PHASING OUT CFCS AT TAKI EDDIN AND COMPANY $ 244,204 
MP/SYR/97/111 PHASING OUT CFCS AT AL YAMAN COMPANY $ 213,392 
MP/SYR/97/110 PHASING OUT CFCS AT AHMED ALI HARSHO SONS COMPANY $ 171,533 
MP/SYR/97/042 PROJECT PREPARATION IN THE FLEXIBLE FOAM SECTOR $ 9,639 
MP/SYR/97/019 PHASING OUT CFC-11 AT WALID AND NABIL RANKOUSI LTD. $ 84,607 
MP/SYR/97/018 PHASING OUT CFC-11 AT ABDUL KARIM SBEI $ 90,272 
MP/SYR/97/016 PHASING OUT CFCS AT CAREESSE COSMETICS $ 271,413 
SI/SYR/96/802 HIGH LEVEL TECHNICAL ADVICE TO INTRODUCE PHARMACEUTICAL QUALITY-MANAGEMENT SYSTEM IN THE PHARMACEUTICAL INDUSTRY $ 48,106 
SI/SYR/96/801 URGENT HIGH LEVEL ADVISORY ASSISTANCE FOR ESTABLISHMENT OF AN AGROCHEMICAL FORMULATION PLANT IN SYRIA $ 16,618 
MP/SYR/96/121 PHASING OUT CFCS AT GASTON BANNA AND SONS COMPANY $ 299,500 
MP/SYR/96/119 PHASING OUT CFC-11 AT DAKKAK COMPANY FLEXIBLE POLYURETHANE FOAM PLANT $ 96,553 
MP/SYR/96/086 INVESTMENT PROJECT FOR PHASING OUT CFCS AT KRAYEM COLD STORES COMPANY $ 635,372 
UC/SYR/96/074 PREPARATORY ASSISTANCE TO ESTABLISH A TEXTILE AND CLOTHING DESIGN CENTRE $ 6,616 
MP/SYR/96/024 PREPARATION OF AN INVESTMENT PROJECT IN THE AEROSOL SECTOR $ 24,254 
MP/SYR/96/014 PHASING OUT OF CFCS FROM MANUFACTURING OF DOMESTIC AND COMMERCIAL REFRIGERATORS AT KRAYEM BROTHERS COMPANY $ 1,058,017 
DP/SYR/96/004 QUALITY ASSURANCE ASSISTANCE - ISO 9000 $ 229,678 
DP/SYR/95/003, GC/SYR/95/A03, NT/SYR/95/003 TEXTILE AND CLOTHING DEVELOPMENT CENTRE $ 72,793 
SI/SYR/95/801 ASSISTANCE IN MODERNIZATION OF THE NATIONAL METROLOGY CALIBRATION SYSTEM $ 45,075 
MP/SYR/95/042 INVESTMENT PROJECT FOR PHASING OUT CFCS AT BARADA, GENERAL COMPANY FOR METALLIC INDUSTRY $ 894,058 
MP/SYR/95/041 INVESTMENT PROJECT FOR PHASING OUT OF CFCS AT PENGUIN (SYRIAN BATRIC COMPANY) $ 1,718,659 
MP/SYR/95/008 PREPARATION OF INVESTMENT PROJECT FOR PHASING-OUT OF CFCS IN MANUFACTURING OF REFRIGERATORS AT KRAYEM INT. CO. $ 14,289 
MP/SYR/95/007 PREPARATION OF INVESTMENT PROJECT FOR PHASING-OUT OF CFC 11 FROM THE MANUFACTURING OF PRE-FABRICATED SANDWICH PANELS AT KRAYEM COLD STORES CO. $ 13,596 
MP/SYR/95/006 PREPARATION OF INVESTMENT PROJECTS FOR PHASING OUT OF CFC-11 FROM THE SUBSECTOR OF FLEXIBLE FOAMS MANUFACTURING $ 20,000 
DP/SYR/95/003, GC/SYR/95/A03, NT/SYR/95/003 TEXTILE AND CLOTHING DEVELOPMENT CENTRE $ 420,294 
DP/SYR/95/003, GC/SYR/95/A03, NT/SYR/95/003 TEXTILE AND CLOTHING DEVELOPMENT CENTRE $ 12,350 
MP/SYR/94/412 PHASING OUT OF CFCS AT AL HAFEZ REFRIGERATOR COMPANY $ 2,883,277 
NC/SYR/94/01D STUDY ON INDUSTRIAL POLICIES/STRATEGIES $ 68,604 
MP/SYR/93/148 SUPPORT TO STRENGTHENING THE GENERAL COMMISSION FOR ENVIRONMENTAL AFFAIRS TO IMPLEMENT MONTREAL PROTOCOL RELATED ACTIVITIES $ 219,908 
MP/SYR/93/118 PREPARATION OF INVESTMENT PROJECT PROPOSALS FOR THE PHASE-OUT OF CFC-11 AND CFC -12 IN THE DOMESTIC REFRIGERATION INDUSTRY $ 34,995 
SI/SYR/92/801 TECHNICAL ADVISORY ASSISTANCE TO THE GENERAL COMPANY FOR TYRE INDUSTRIES $ 55,536 
DP/SYR/92/012 ESTABLISHMENT OF A NATIONAL CAD CENTRE FOR ENGINEERING AND TEXTILE INDUSTRY $ 38,143 
DP/SYR/92/009, NT/SYR/92/009 INTRODUCTION OF COMPUTER MANAGED MAINTENANCE SYSTEM INTO THE SYRIAN INDUSTRIAL SECTOR $ 35,150 
DP/SYR/92/009, NT/SYR/92/009 INTRODUCTION OF COMPUTER MANAGED MAINTENANCE SYSTEM INTO THE SYRIAN INDUSTRIAL SECTOR $ 505,498 
DU/SYR/92/008 INTEGRATED DEVELOPMENT OF THE NATIONAL PHARMACEUTICAL INDUSTRY $ 174,725 
DP/SYR/92/004, NT/SYR/92/004 PREPARATORY ASSISTANCE IN THE TREATMENT OF TANNERY WASTES IN ZABLATANI-DAMASCUS INDUSTRIAL AREA $ 427,169 
DP/SYR/92/004, NT/SYR/92/004 PREPARATORY ASSISTANCE IN THE TREATMENT OF TANNERY WASTES IN ZABLATANI-DAMASCUS INDUSTRIAL AREA $ 21,850 
SI/SYR/90/801 ASSISTANCE TO THE DEIR EZZOR PULP/PAPER MILL $ 42,782 
US/SYR/90/180 CONSULTANCY SERVICES REGARDING COMPUTER APPLICATIONS IN OFFICE AND INDUSTRY $ 35,398 
UC/SYR/89/241 PREPARATORY ASSISTANCE FOR THE ESTABLISHMENT OF A DEMONSTRATION PRODUCTION FOUNDRY $ 35,435 
UC/SYR/88/225 ADVISORY SERVICES TO THE SYRIAN ARAB REPUBLIC ON INDUSTRIAL STRATEGY $ 94,260 
DP/SYR/86/011 STRENGTHENING THE CAPABILITY OF THE SYRIAN SCIENTIFIC STUDIES AND RESEARCH CENTRE IN THE FIELD OF OPTICAL TECHNOLOGY $ 1,859,892 
DP/SYR/86/010 INDUSTRIAL QUALITY ASSURANCE $ 660,204 
DP/SYR/86/009 HIGH-LEVEL CONSULTANCIES AND TRAINING (IN COOPERATION WITH PROJECT DP/SYR/86/010) $ 735,686 

Total: 101 $ 25,533,314